Land plot allocation, subdivision, merger, boundary establishment and changes to identification characteristics across Kazakhstan.
Geodesy, land management and engineering surveys
We work across six disciplines in Mangystau Region and throughout Kazakhstan, providing end-to-end support from the initial brief to permit documentation.
A complete service range from one team
Surveying, documentation and handover stay with one contractor, reducing coordination work and discrepancies for the client.
Topographic surveys, digital terrain models, profiles and GPS measurements: the foundation of a successful construction project.
Setting-out works, as-built surveys and deformation monitoring from excavation to handover.
Drilling, soil sampling and laboratory analysis for foundation design input data.
Plate bearing, CPT, DPT and pressuremeter testing — we determine soil properties for reliable foundation design.
Development of land reclamation projects for oil and gas sites, quarries and industrial facilities.
6 stages from request to site handover
Established procedures reduce deviations and give the client control at every stage.
- 01Application
Receiving the application for a land management project.
- 02Preparation
Collecting archive, cadastral and cartographic materials and carrying out a field inspection.
- 03Development
Preparing the graphic and explanatory parts of the project under Kazakhstan law.
- 04Compilation
Compiling the project into a single document for approval.
- 05Approval
Approval of the land management project by local executive bodies and receipt of title documents.
- 06Execution
Setting out the project on site, fixing boundaries and handing results to the client.
- 07Receipt of identification documents
Filing an application to receive identification documents (state act) and obtaining registration.
Trusted by
Need a project estimate?
Send the brief or call us and we will return a preliminary site estimate within 24 hours.
Frequently asked questions
Which industries do you work with?
Oil and gas operators, industrial enterprises, construction holdings, ports, energy, the public sector and private investors in Mangystau Region and across Kazakhstan.
Can several services be ordered under one contract?
Yes. Clients often combine surveys, land management and construction support. In that case we assign one project manager and provide package pricing.
Do you work outside Mangystau Region?
Yes. We have delivered projects in Karaganda, Atyrau and Aktobe regions and on the Caspian coast, using field crews with SHACMAN vehicles.
What are the timelines for a typical project?
Control measurement takes 3 to 5 days. Topographic survey up to 50 ha takes 7 to 14 days. A full land management project takes 14 to 45 days including authorized-body procedures.